ROSEVILLE JR. HIGH
1/12/07 / MONTHLY INSPECTION
NO REPORTS / IPM STICKER LEFT
__________________________________________________________________
2/8/07 / MONTHLY INSPECTION
MICE REPORTED. REQUESTED GLUEBOARDS. SUGGEST COMPLETE RODENT
BLOW OUT OF SCHOOL / IPM STICKER LEFT
__________________________________________________________________
3/8/07 / MONTHLY INSPECTION
CHECKED MONITORS. NO ACTIVITY / IPM STICKER LEFT
___________________________________________________________________
4/12/07 / MONTHLY INSPECTION
CHECKED MONITORS. REPLACED THREE GLUEBOARDS DUE TO RODENT
ACTIVITY. ANTS REPORTED IN BOOK ; HOWEVER, UPON INSPECTION, ONE
FOUND. NO CURRENT ACTIVITY / IPM STICKER LEFT
___________________________________________________________________
5/10/07 / MONTHLY INSPECTION
CHECKED MONITORS FOR ACTIVITY. REPLACED ONE GLUEBOARD FOR MOUSE
LEFT. PLACED CATCHMASTER GLUEBOARDS IN KITCHEN, OFFICE, AND LIBRARY.
BAITED POOL FOR ANTS / IPM STICKER LEFT
_________________________________________________________________
6/14/07 / MONTHLY INSPECTION
CHECKED MONITORS. NO ACTIVITY. PLACED CATCHMASTER GLUEBOARDS
IN ROOM 122 FOR MICE PER BOOK / IPM STICKER LEFT
_________________________________________________________________
7/12/07 / MONTHLY INSPECTION
CHECKED MONITORS. NO ACTIVITY. NO REPORTS IN BOOK. LEFT NEW BOOK.
IPM STICKER LEFT
_________________________________________________________________
8/9/07 / MONTHLY INSPECTION
CHECKED MONITORS. REPLACED THREE GLUEBOARDS DUE TO RODENT
ACTIVITY. NO REPORTS IN BOOK / IPM STICKER LEFT
_________________________________________________________________
8/31/07 / STINGING INSECT CONTROL / WALL NEST
USED DUST IN VOID FOR DESTRUCTION OF WASPS / IPM STICKER LEFT
_________________________________________________________________
9/13/07 / MONTHLY INSPECTION
LIBRARY OFFICE, MAIN OFFICE, HEAD ROOM, SNACK BAR, AND ROOMS 217,
219, AND 223 HAS MICE. CAUGHT THREE MICE ON GLUEBOARDS AND
CHANGED BOTH PROTECTAS / IPM STICKER LEFT
_________________________________________________________________
ON CALL
USED KONK FOAM IN VOID IN FRONT FOR BEES / IPM STICKER LEFT
_________________________________________________________________
10/11/07 / MONTHLY INSPECTION
NO REPORTS IN BOOK. ALL MONITORS AND GLUEBOARDS CLEAR
IPM STICKER LEFT
________________________________________________________________
9/26/07 / ON CALL STINGING INSECT
TREATED WALL VOID IN FRONT FOR BEES. IT LOOKS AS IF THE BEES ARE
NOT NESTING IN THE CEILING BUT THEY MAY CLIMB THE VOID AND GET
IN BY THE HOLE IN THE PART OF THE CEILING WHERE THE WIRES ARE
PLACED FOR LIGHTS. IPM STICKER LEFT
_______________________________________________________________
11/08/07 / MONTHLY INSPECTION
PLACED PROTECTAS IN BOTH KITCHEN AND OFFICE. GAVE FOUR
CATCHMASTERS FOR CONTROL OF MICE. MAY NEED A BOX OF
GLUEBOARDS FOR THE SCHOOL. THEY HAVE TO KEEP THE DOORS
CLOSED AS MUCH AS POSSIBLE. MOUSE WAS FOUND IN ONE OF THE
GLUEBOARDS IN THE OFFICE / IPM STICKER LEFT
_______________________________________________________________
12/13/07 / MONTHLY INSPECTION
MICE HAVE NOT CALMED DOWN AT ALL. CURRENTLY INTO THIRD
MONTH OF TREATMENT. MICE ARE STILL FOUND IN SAME AREAS.
TECHNICIAN SUGGESTS COMPLETE BLOW OUT OF BUILDING.
IPM STICKER LEFT.
_______________________________________________________________
1/10/08 / MONTHLY INSPECTION
NO NEW REPORTS WERE IN BOOK. ALL MONITORS WERE CHECKED AND
CLEAR BY TECHNICIAN / IPM STICKER LEFT
_______________________________________________________________
1/29/08 / ON CALL ANTS / DRY GOODS ROOM
TREATED BOTH ROOMS FOR ANT ACTIVITY / IPM STICKER LEFT
_______________________________________________________________
2/14/08 / MONTHLY INSPECTION
MICE IN MOST ROOMS. PLACED GLUEBOARD IN OFFICE. BOTH KITCHENS
LEFT GLUEBOARDS WITH CUSTODIAN. FOUND MOUSE IN KITCHEN PROTECTA.
DISPOSED OF RODENT AND CHANGED GLUEBOARD. IPM STICKER LEFT
_______________________________________________________________
3/13/08 / MONTHLY INSPECTION
DID OUTSIDE INSPECTION. ALL DOORS WERE LOCKED / IPM STICKER LEFT
________________________________________________________________
5/8/08 / MONTHLY INSPECTION
CAUGHT THREE MICE IN KITCHEN. REPLACED THE GLUEBOARD AND GAVE
THE CUSTODIAN SEVEN EXTRA GLUEBOARDS FOR PREVENTION.
IPM STICKER LEFT
__________________________________________________________________
6/12/08 / MONTHLY INSPECTION
CHECKED ALL MONITORS. REPLACED TWO GLUEBOARDS DUE TO RODENT
ACTIVITY. MICE FOUND ON EACH BOARD. PLACED CATCH MASTER GLUEBOARDS DUE TO
MULTIPLE RODENT SIGHTINGS IN BOOK. SUGGEST BLOWOUT OF BUILDING DUE TO MAJOR
RODENT ACTIVITY. IPM STICKER LEFT.
____________________________________________________________________
8/14/08 / MONTHLY INSPECTION
CHECKED ALL MONITORS, REPLACED ONE GLUEBOARD DUE TO RODENT ACTIVITY.
REPORTS OF MICE IN BOOK. FOUND MOUSE ON TWO GLUEBOARDS IN RECIEVING ROOM.
REPLACED GLUEBOARDS. IPM STICKER LEFT.
______________________________________________________________________
9/04/08 / ON CALL STINGING INSECT CONTROL
TREATED WASP NEST OUTSIDE BUILDING. IPM STICKER LEFT.
_______________________________________________________________________
9/12/08 / MONTHLY INSPECTION
CHECKED ALL MONITORS. ALL CLEAR. REPORTS OF TERMITES IN ROOM 4. TREATED
USING. AR-X. IPM STICKER LEFT.
______________________________________________________________________
9/19/08 / BAITING OF SCHOOL
PLACED THIRTY LOCKING STATIONS AROUND PERIMETER OF BUILDING. BAITED
UNI-VENTS AND CEILING FOR MICE CONTROL. IPM STICKER LEFT.
_____________________________________________________________________
10/17/08 / MONTHLY INSPECTION
TREATED KITCHEN FOR ANTS. INSPECTED STAFF LOUNGE. CHECKED ALL MONITORS.
NO OTHER REPORTS. IPM STICKER LEFT.
_____________________________________________________________________
11/14/08 / MONTHLY INSPECTION
A ROACH WAS NOTED IN BOYS RESTROOM BY LOUNGE. PLACED PHEROMONE
TRAPS IN RESTROOM FOR MONITORING. AL MONITORS CLEAR. IPM STICKER LEFT.
_____________________________________________________________________
12/09/08 / MONTHLY INSPECTION
CHECKED ALL MONITORS. ALL CLEAR. REPORTS OF ANTS IN ROMM 155 , BUS AREA,
CAFETERIA, AND CUSTODIAN OFFICE. PLACED INTICE. IPM STICKER LEFT.
______________________________________________________________________
1/8/09 / MONTHLY INSPECTION
CHECKED ALL MONITORS. ALL WERE CLEAR. REPORTS OF ANTS IN CBS. BAITED
USING INTICE / IPM STICKER LEFT
______________________________________________________________________
2/13/09 / MONTHLY INSPECTION
BUILDING IS LOCKED. COULD NOT GET IN. PERFORMED OUTSIDE INSPECTION.
NO REPORTS / IPM STICKER LEFT
______________________________________________________________________
|